
Short answer
Check a mountain plot for landslide risk in three moves. Walk it first: cracks in the ground, leaning trees and fence posts, new springs at the foot of the slope. Then measure the gradient, because the Ukrainian building norm DBN V.1.1-46:2017 requires slopes steeper than 5 degrees to be checked for landslide potential. Finally ask the council for its general or community plan, which the law says must be open to the public. If anything looks wrong, only a ground investigation gives a firm answer.
A plot on a hillside with a mountain view sells faster than flat land down in the valley, and the seller rarely mentions that the fence below leaned over last spring. A slow landslide is easy to miss on a sunny viewing, yet it leaves marks you can read in an hour on foot. This article covers what to look for, the gradient at which a formal check becomes necessary, and which council papers to see before you pay a deposit.
Is there a map that shows landslide risk for a single plot?
We could not find a public map that tells a buyer the landslide risk of one particular plot. The closest thing is the planning paperwork of the local community: its comprehensive spatial plan, or the general plan of the village or town. Ukraine's urban planning law lists engineering preparation and protection of land among the design decisions of a comprehensive plan, so that is where a council records slopes it already treats as a problem.
Your own eyes and a tape measure are the second source, and they work on any plot, even where the council has no plan yet. The third, a geotechnical investigation, costs money, but it is the only thing a house designer can actually rely on.
At what gradient does a slope need a landslide check?
Earlier than most buyers expect. DBN V.1.1-46:2017, the Ukrainian norm on protecting land and buildings from landslides and rockfalls (listed as in force in the national register of building norms), says any slope steeper than 5 degrees must be checked for the possibility of landslides, and that river valley sides above 5 degrees may be landslide-prone and need special study. On a mountain plot that means a check is nearly always due.
Five degrees looks close to flat. The table turns degrees into numbers you can picture: the height difference across a plot 30 or 50 metres deep, and the gap under a two-metre straightedge held level.
| Slope | Per cent | Fall over 30 m | Fall over 50 m | Gap under a 2 m straightedge |
|---|---|---|---|---|
| 3° | 5.2% | 1.6 m | 2.6 m | 10.5 cm |
| 5° | 8.7% | 2.6 m | 4.4 m | 17.5 cm |
| 10° | 17.6% | 5.3 m | 8.8 m | 35 cm |
| 15° | 26.8% | 8.0 m | 13.4 m | 54 cm |
| 20° | 36.4% | 10.9 m | 18.2 m | 73 cm |
| 25° | 46.6% | 14.0 m | 23.3 m | 93 cm |
To measure it without instruments, rest one end of a straight two-metre batten on the slope, hold it level with a spirit level and measure from the lower end down to the ground. Anything above 17 or 18 cm means the slope is steeper than 5 degrees. Take readings in several places, since one plot often has a gentle top and a steep bottom.
Signs on the ground that a slope is moving
Ready.gov, run by the US Federal Emergency Management Agency, publishes a list of signs that soil on a slope is on the move. We have grouped them the way you meet them while walking a plot in the Carpathians.
In the soil
- Cracks in the ground, a track or a driveway that widen over time. A fresh crack running across the top of the plot matters more than any puddle.
- Ground that bulges at the foot of the slope.
- Land that sags towards one side and forms small steps, as if someone had cut terraces badly.
- Water breaking out where it did not before, such as a wet patch on an otherwise dry slope or a spring the neighbours do not remember.
In trees, fences and nearby buildings
- Trees, poles, fences or retaining walls that tilt or have shifted. Walk the fence line: posts all leaning downhill are worth writing down.
- New cracks in plaster, tiles, brick or foundations of the houses next door.
- Steps, paths and outside walls pulling away from a building.
- Doors and windows that have started to stick. In an old house for sale, ask when that began.
The norm adds a detail that is easy to miss: a ground investigation of a slope records which trees grew there in the past, alongside today's vegetation. So old aerial images of the area are useful for more than plot boundaries. If images from different years show a bare wedge appearing in woodland, or the road below repeatedly buried under soil, that slope has a history.
Erosion: when the slope washes away rather than slides
Erosion is slower than a landslide and costs an owner more than it seems. Rainwater gathers in one line, cuts a channel and deepens it every winter. Ready.gov advises watching where storm water runs on a slope and where flows meet, because a change in those paths can be the first sign of ground movement.
On a viewing, look for fresh gullies, exposed roots along their edges and sand or gravel washed onto the road after rain. An unpaved track above the plot with no ditch will send its water straight across your land. How much water one storm can bring is covered in our piece on 30 years of downpours around Kosiv, and plots on a stream bank have their own rules, set out in the article on the riparian buffer strip.
Causes of earlier recorded landslides that have not been removed, and a long absence of signs of ground displacement, do not show that the slope is stable.
Keep that sentence in mind when a seller says the slope slipped two generations ago and has been quiet ever since. Time does not make a slope safe. What does is removing the cause: drained water, an unloaded crest, engineered protection.
Which council documents to ask for, and how
- Find out which plan appliesWhere a community covers several villages, the main document is its comprehensive spatial plan, and the general plans of individual villages sit inside it. Ask the village, town or city council what has been approved for your settlement.
- Check the council websiteThe law says access to comprehensive and general plan materials may not be restricted, apart from classified information, and provides for publishing them, including on the local council's own website. Start there.
- Send a request for informationIf nothing is online, file a request under the Law on Access to Public Information. The council must answer within five working days, or up to twenty if the request is large and it tells you so. Information on request is free; you pay only for copies over ten pages.
- Read the relevant sectionsOpen the measures for engineering preparation and protection of land and the maps of restrictions. Find your plot by its cadastral number and see whether slopes marked for protection lie close by.
- Compare the plan with what you sawA blank section does not prove the slope is stable, because the plan covers the whole community, not every individual plot. If the plot shows signs from the lists above, decide on the strength of a ground investigation.
Turning what you found into a decision
| What you found | What it may mean | Next step |
|---|---|---|
| Slope under 5°, no cracks or wet patches | The norm does not call for a separate landslide check | A normal soil investigation for the foundation at design stage |
| Slope over 5°, no visible movement | The plot needs checking for landslide potential | Budget for a ground investigation before agreeing the final price |
| Fresh gullies, water from the track above crossing the plot | Erosion and surface runoff that will deepen the channel | Price the drainage before buying; it is part of the cost of the land |
| Leaning posts, cracks in neighbouring houses, steps in the slope | The slope may have moved or may be moving | Pay no deposit until the investigation report is in |
| A new spring or wet patch at the foot, plot sitting in a hollow | Groundwater reaching the surface; the norm names hollows and groundwater outflow among the riskiest parts of a slope | An investigation that studies groundwater, not just one borehole for the foundation |
When to walk away
Walk away if the signs of movement are fresh and the seller will not wait for an investigation, or if the report confirms a landslide-prone slope and the cost of protecting it wipes out the price gap between this plot and a calmer one. How slope protection turns into a separate engineering job, and why foundations cost more on a hillside, is explained in our article on foundations on a slope.
The other checks, from land use category to road access, are gathered in how to check a land plot in the Carpathians. Plots with documents already checked are listed under land for sale in the Carpathians.
Frequently asked questions
Sources
- DBN V.1.1-46:2017, protection of land, buildings and structures from landslides and rockfalls (national register of building norms). listed as in force in the record dated 22 April 2026; clause V.1.3 on the 5-degree threshold, V.1.4 on earlier landslides, V.3.7 on hollows and groundwater outflow, section 5 on vegetation data in investigations
- Law on Regulation of Urban Planning Activity, article 16-1 (protocol.ua copy, in Ukrainian). part 10 puts engineering preparation and protection of land in the comprehensive plan; part 14 on public access to its materials
- Law on Regulation of Urban Planning Activity, article 17 (protocol.ua copy, in Ukrainian). village general plans within a community plan; part 15 on publication and requests
- Law on Access to Public Information, articles 20 and 21 (protocol.ua copy, in Ukrainian). five working days to answer, extendable to twenty; free apart from copies over ten pages
- Ready.gov (FEMA): Landslides and debris flow. warning signs of moving ground and advice on storm water paths
- European Landslide Susceptibility Map ELSUS v2 (ESDAC, European Commission Joint Research Centre). countries covered and the warning about scale
This article is general information and does not replace a ground investigation or advice from a structural designer. The Ukrainian laws were read on 16 November 2026 on the protocol.ua copy because the official portal zakon.rada.gov.ua did not open that day; the status and text of the DBN were checked in the e-construction register the same day. Confirm current versions with official sources.


